Project Description

Harvard Science
Cambridge, MA

83,000 yards and 8000 tons of reinforcing installed in a matt foundation consisting of 25 placements of approximately 2600 yards each and 3000 linear ft of 27ft high walls. At its peak the project was supported with two 999 cranes on the surface and 3 smaller cranes in the hole allowing the work to be completed in 10 months.

< BACK TO PROJECTS PAGE